October Production Reports – 2021
All projects were below their production estimates for the month of October. One Energy performed inspections at Lafarge, Ball 1, and Ball 2. Goldwind performed maintenance at Haviland, Cooper, Valfilm, Ball 2, Whirlpool Ottawa, Harpster, and Ball 1. A blade repair was performed at Cooper.