July Production Reports – 2020
All projects were under their P50 production estimate for the month of July. Plant maintenance was performed at Whirlpool Marion and Haviland. Owner/Operator Maintenance was performed at Ball 1.0. The addition of the Zephyr 2.0 turbines and the change in production estimates will be reflected in the August report.